|
|
|
d
Due Diligence Status Reports and Documents*
- Topographic Survey - Mapping from
aerials flown in 2001
- Land Survey Plat dated 12/19/01 by
GeoSurv Land Surveying
- Geologic Hazards - Preliminary Geologic
Hazards Assessment completed in August 2000
- Transportation Study - Completed in
September 2000
- Plan of Augmentation for Pole Creek
Meadows (now Pole Creek Valley) and Scott Bradley Developments
by Blatchley Associates, Inc.
- Tabernash Meadows Water and Sanitation
District - Redhawk Sewage Collection System Analysis dated 2001
by both Martin and Martin and Rothberg, Tamburini, Winsor
- Tabernash Meadows Water and Sanitation
District - Redhawk Water Distribution System Analysis dated 2001
by both Martin and Martin and Rothberg, Tamburini, Winsor
- Tabernash Meadows Water and Sanitation
District "District" - Financing for the inclusion of
the Redhawk Development into the District for water and sewer
- Tabernash Meadows Water and Sanitation
District, Grand County, Colorado General Obligation Bonds Series
2000 Offering Memorandum
- Ground Water Evaluation and Development
for Tabernash Springs Development by F.M. Fox & Associates,
Inc.
- Drainage, Runoff Control, Revegetation
for Indian Springs by Edward H. Opitz, Professional Engineer
- Flood Plain Study - Crooked Creek
and Pole Creek by Robinson Engineering and Surveying Co.
- Preliminary Soil and Foundation Investigation
by Kal Zeff and Associates Ltd.
- Soils Report by Drake Engineering
and Construction Co.
- Percolation Test, Soil Report by Rudi
Pietu
- Grand County Resolution No. 1999-8-01
- A resolution passed in 1999 approving a right-of-way acquisition
agreement for the Fraser Valley Parkway and a Road Right-of-Way
Dedication and Development Agreement dated 2001
* Available Upon
Request
|
|